Examples of such pressure cycles are: 5.5.0 lncreasing wellhead pressure to test either a liner top, blowout preventer, Hydril or tree 5.5.1 lncreasing wellhead pressure to test for casing leaks 5.5.2 Squeezing 5.5.3 ... A cement bond log recorded after such pressure cycles may not accurately represent the annular cement fill. ... The ldeal recommended procedure is: 5.7.0 Research well history to ascertain the maximum casing fluid pressure exerted on the casing since the annularanbsp;...
Title | : | Cement Bond Logging Field Reference Manual |
Author | : | |
Publisher | : | - 1983 |
You must register with us as either a Registered User before you can Download this Book. You'll be greeted by a simple sign-up page.
Once you have finished the sign-up process, you will be redirected to your download Book page.
How it works: